As the Enterprise Research Campus (ERC) project continues, we will provide project notifications that outline upcoming and impactful activities, including a map of the area for reference.
Residential/Hotel
- Work will be underway this Saturday, April 20 starting at 7 a.m.
- Utility exploratory test pits will be conducted at the middle gate at Western Avenue and inside the fence.
- Crews will be preparing for concrete placements and steel erection.
- Tower cranes will be operational.
- Structural steel continues to be delivered and installed at the hotel. Crews working on level five.
- Concrete operations are ongoing.
- Intermittent use of power trowels for concrete finishing may take place after 6 a.m.
- Visible work is underway with work progressing to level six of the high rise and midrise residential buildings.
Laboratory and Office Buildings
- Work will be underway this Saturday, April 20 starting at 7 a.m.
- A small crew will be doing steel work and clean up.
- The two tower cranes are operating and structural steel continues to be delivered and installed on both the east and west buildings.
Greenway
- This section of the site is currently being used for laydown space.
Treehouse Conference Center
- Work will take place this Saturday, April 20, starting at 7 a.m.
- Crews will be preparing for placements.
- Masons will be working on the core.
- A crane will be operating on site.
- Work is underway on the elevator cores with a concrete placement early next week.
- Underground utility work is taking place inside the site.
- Temporary power is being installed on site. Eversource may use a vacuum truck on Friday, April 19 or on Monday, April 22 off Western Avenue.
Building Mock-Ups
- Punchlist work is ongoing on all five mockups.
General
- The site’s four tower cranes have been erected and are operational. They are designed to move or “weathervane” in the wind.
- Drones will be in use bi-weekly to monitor construction progress on site.
- Drones will be operated by licensed pilots in accordance with Harvard University and the City of Boston regulations.
- Flights are weather dependent and are scheduled Wednesdays, Thursdays or Fridays from 7 a.m. to 9 a.m. alternating weekly.
- A drone flight is scheduled for Friday, April 19 from 7 a.m. to 9 a.m.