As the Enterprise Research Campus (ERC) project continues, we will provide project notifications that outline upcoming and impactful activities, including a map of the area for reference.
Residential/Hotel
- There will be work this Saturday, March 9 starting at 7 a.m.
- Crews will be preparing for concrete placements.
- Tower cranes will be operational.
- Concrete operations are ongoing.
- Intermittent use of power trowels for concrete finishing may take place after 6 a.m.
- Crews continue erecting the hotel core structure.
- Visible work is underway on the sky deck, level two and beginning on level three.
- Temporary overhead electrical connection has been installed on site to power the field trailers and has eliminated another large generator on site.
Laboratory and Office Buildings
- Structural steel is being delivered and installed on the first floor of the west tower using the tower crane.
- The foundation wall will be completed next week and all bracing removed.
- Temporary power is installed on site.
Greenway
- This section of the site is currently being used for laydown space.
Treehouse Conference Center
- Work will take place this Saturday, March 9, starting at 7 a.m.
- Concrete crews will be preparing for placements.
- Work is underway on the elevator core.
- Concrete placements and rebar operations are ongoing.
- Temporary power is being installed on site. Eversource may use a vacuum truck.
Building Mock-Ups
- Work is ongoing at the Residential/Hotel mockups.
- Treehouse Conference Center mockup work is finishing up.
- Punchlist work is ongoing at the Laboratory mockup.
General
- The site’s three tower cranes have been erected and are operational. They are designed to move or “weathervane” in the wind.
- Drones will be in use bi-weekly to monitor construction progress on site.
- Drones will be operated by licensed pilots in accordance with Harvard University and the City of Boston regulations.
- Flights are weather dependent and are scheduled Wednesdays or Thursdays from 7 a.m. to 9 a.m. alternating weekly.
- No drone flight is scheduled this month.
- After hours snow removal operations will be ongoing throughout the winter months during periods of inclement weather.