As the Enterprise Research Campus (ERC) project continues, we will provide project notifications that outline upcoming and impactful activities, including a map of the area for reference.
Residential/Hotel
- There will be work this Saturday, February 24th, starting at 7AM.
- Crews will be preparing for concrete placements.
- Tower cranes will be operational.
- Concrete operations are ongoing.
- Intermittent use of power trowels for concrete finishing may take place after 6PM.
- Crews continue erecting the hotel core structure.
- Visible work is taking place on the sky deck and level two.
- Temporary overhead power will be installed on site to power the field trailers and eliminate another generator on site.
- The site’s two tower cranes have been erected and are operational. They are designed to move or “weathervane” in the wind.
Laboratory and Office Buildings
- There will be work this Saturday, February 24th, starting at 7AM.
- Crews will be removing bracing.
- Concrete and rebar operations are ongoing.
- Continue to place crushed stone on the foundation bottom.
- Crews are preparing for the first of two tower cranes to be erected on Saturday, March 2nd and Sunday, March 3rd.
- A 6AM start and possible after-hours work will be needed to support this operation.
- Temporary power is being installed on site.
Greenway
- This section of the site is currently being used for laydown space.
Treehouse Conference Center
- There will be work this Saturday, February 24th, starting at 7AM.
- Concrete crews will be preparing for wall placements.
- Concrete placements and rebar operations are ongoing.
- Temporary power is being installed on site.
Building Mock-Ups
- Work will take place at the Residential/Hotel mockups.
- Treehouse Conference Center mockup mass timber panels are being installed and other work continues.
- Punchlist work is ongoing at the Laboratory mockup.
- A lane shift around lifts and intermittent deliveries will take place on Rotterdam Street.
General
- Drones will be in use bi-weekly to monitor construction progress on site.
- Drones will be operated by licensed pilots in accordance with Harvard University and the City of Boston regulations.
- Flights are weather dependent and are scheduled Wednesdays or Thursdays from 7AM to 9AM alternating weekly.
- No drone flights are scheduled next week.
- After hours snow removal operations will be ongoing throughout the winter months during periods of inclement weather.