Enterprise Research Campus Update #12 (Week of October 23, 2023)

As the Enterprise Research Campus (ERC) project continues, we will provide project notifications that outline upcoming and impactful activities, including a map of the area for reference.

Residential/Hotel

  • Bulk excavation and concrete operations on site will continue.
  • The first of two tower cranes has been erected and is operational. It is designed to move or “weathervane” in the wind.
  • Work will take place on Saturday, October 21st.
    • Crews will be working within the site foundation.

Laboratory and Office Buildings

  • Bulk excavation and concrete operations on site will continue.
  • Rebar work is ongoing in preparation for the mat slab placement.
  • Waterproofing work continues on the site foundation.
  • Work will take place on Saturday, October 21st.
    • A large crane will be assembled on site.
      • Due to the size of the crane a 12-hour workday is needed.
        • Crews plan to begin at 6:00am and work until 6:00pm.
      • This crane will remain onsite through February and will support the mat slab placement.

Greenway

  • This section of the site is currently being used for laydown space.

Treehouse Conference Center

  • Bulk excavation of the site will begin Friday, October 20th.
    • Soil will be transported via intermodal trucks via the site haul road to Beacon Park Yard.
  • Work will take place on Saturday, October 21st.
    • Crews will be excavating and hauling soil within the site to Beacon Park Yard.
    • Work will begin at 9:00am.

Building Mock-Ups

  • Jersey barriers and site fence for the Residential/Hotel mock-ups will begin to be installed on Monday, October 23rd.
  • Punch list work on the two Laboratory mockups will continue.