As the Enterprise Research Campus (ERC) project continues, we will provide project notifications that outline upcoming and impactful activities, including a map of the area for reference.
Residential/Hotel
- Bulk excavation and concrete operations on site will continue.
- The first of two tower cranes has been erected and is operational. It is designed to move or “weathervane” in the wind.
- Work will take place on Saturday, October 21st.
- Crews will be working within the site foundation.
Laboratory and Office Buildings
- Bulk excavation and concrete operations on site will continue.
- Rebar work is ongoing in preparation for the mat slab placement.
- Waterproofing work continues on the site foundation.
- Work will take place on Saturday, October 21st.
- A large crane will be assembled on site.
- Due to the size of the crane a 12-hour workday is needed.
- Crews plan to begin at 6:00am and work until 6:00pm.
- This crane will remain onsite through February and will support the mat slab placement.
- Due to the size of the crane a 12-hour workday is needed.
- A large crane will be assembled on site.
Greenway
- This section of the site is currently being used for laydown space.
Treehouse Conference Center
- Bulk excavation of the site will begin Friday, October 20th.
- Soil will be transported via intermodal trucks via the site haul road to Beacon Park Yard.
- Work will take place on Saturday, October 21st.
- Crews will be excavating and hauling soil within the site to Beacon Park Yard.
- Work will begin at 9:00am.
Building Mock-Ups
- Jersey barriers and site fence for the Residential/Hotel mock-ups will begin to be installed on Monday, October 23rd.
- Punch list work on the two Laboratory mockups will continue.